| Procedures for Manufacture licensing
of Boiler and Pressure Vessel
Chapter 1 General Rules
Article 1 In order to regulate the procedures for
manufacture licensing of boiler and pressure vessel, these
procedures are especially stipulated according to the related rules
in the Supervision Administration Regulation for Manufacture of
Boiler and Pressure Vessel (hereinafter referred as Administration
Regulation).
Article 2 The procedures for manufacture licensing
of boiler, pressure vessel refer to the procedures of application,
acceptance, survey, approval and issuance of manufacture license of
boilers, pressure vessels and safety accessories as well as the
renewal procedure for license beyond the expiration of term of
validity.
Article 3 The Manufacture Licensing Office of
Special Equipment Safety Supervision Department under General
Administration of Quality Supervision, Inspection and Quarantine of
the People¡¯s Republic of China£¨AQSIQ£© is responsible for handling
the daily affair on manufacture licensing.
Chapter 2 Application
Article 4 Submission of Application 1. The
domestic manufacturer, which applies for manufacture licensing of
boiler with level A, B or C, or of pressure vessel with level A, B
or C, and of safety accessories, such as, safety valve, rupture
disc, gas cylinder valve etc., should submit an application to the
Safety Supervision Department under AQSIQ. The application documents
should firstly be reviewed and commented by Provincial Safety
Supervision Department under Provincial Quality and Technical
Supervision Bureau (hereinafter referred to as Provincial Safety
Supervision Department). 2. The domestic manufacturer, which
applies for manufacture licensing of level D boiler or level D
pressure vessel, should submit the application to the Provincial
Quality Supervision Department where the manufacturer located. 3.
The manufacturer outside China, which applies for manufacture
licensing of boilers, pressure vessels or their safety accessories
(safety valve, rupture discs, gas cylinder valves, etc) should
submit the application to the Safety Supervision Department directly
under AQSIQ.
Article 5 The applicant should submit the following
application documents in Chinese or in English. The Chinese or
English translation of them shall be attached when original
documents are in other languages. 1. Fill in application form for
special equipment manufacture licensing in triple (download from
web-site of AQSIQ, www. aqsiq.gov.cn) 2. Introduction on the
manufacturer (background and manufacture capacity). 3. Copy of
the document or business license, which is registered at the local
government according to the laws 4. Copies of qualified license
or certificates that the manufacturer has obtained 6. Typical
products and their related parameters and specifications 7.
Drawing and design document (applicable only for the products that
are required type test. See Article 14 ) 8. Quality manual of
manufacturer 9. Other supplementary documents if deemed
necessary
Chapter 3 Application
Acceptance
Article 6 The Safety Supervision Department in
charge of handling the application will decide whether an
application is acceptable within 15 working days after examining the
application documents from the manufacturer.
Article 7 For the manufacturers, whose application
is acceptable, the Safety Supervision Department will endorse on the
application form and return one copy of the application form to the
manufacturer.
Article 8 For the acceptable application of domestic
manufacturer, the Safety Supervision Department will inform the
related Provincial Safety Supervision Department via letter.
Article 9 For the manufacturers, whose application
is unacceptable, the Safety Supervision Department will affix a
comment of non-acceptance and state the reason of non-acceptance on
the application form, then return one copy of the application form
to the manufacturer.
Article 10 The manufacturer, whose application has
been accepted, should trial-produce the typical product (or pressure
parts) with relevant level for manufacture licensing survey and type
testing (applicable only for the products which are required to do
type testing). The trial-produced product shall be in accordance
with the provisions of the Requirements for Boiler and Pressure
Vessel Manufacture Licensing (hereinafter referred to as Licensing
Requirements)
Chapter 4 Survey and Assessment
Article 11 After completing the trail-produced
product, the manufacturer should ask and contract the Survey and
Assessment Agency for on-site survey. The survey and assessment
shall be done within the contracted time period.
Article 12. The Survey and Assessment Agency shall
draft a survey plan in accordance with related requirements of
survey and assessment, organize survey team and inform the applicant
of the survey schedule at least one week before survey.
Article 13 The survey team shall conduct manufacture
survey and product inspection in accordance with the Licensing
Requirements, which mainly include: 1. Confirm the conditions of
manufacture site and manufacturing and processing equipment,
inspection and testing devices and staff 2. Review the quality
manual and related documents 3. Check the implementation of
quality management system 4. Check the relevant technical
document 5. Examine and test the trial products
Article 14 The products, which are required type
test, such as, gas cylinders, safety valves, bursting disks and
valves for gas cylinder, should complete the following examinations
before the manufacturer survey: 1. Review the related design
documents and drawings 2. Random sampling test products on the
site, conduct type test by a type test agency and the test result
should be in accordance with the relevant standard.
Article 15 The survey team should complete a written
survey report based on the survey results. The conclusion in survey
report shall be classified as ¡°accord with the requirements¡±, ¡°need
to rectify¡± and ¡°disaccord with the requirements¡±.
Article 16. The survey team shall notice the
manufacturer in writing if the survey conclusion is ¡°need to
rectify¡± or ¡°disaccord with the requirements¡±.
Article 17. The manufacturer, whose survey
conclusion is ¡°need to rectify¡±, shall complete the required
rectification with 6 months, and submit its rectification report in
writing to the survey team leader. The survey team shall change the
conclusion to ¡°accord with the licensing requirements¡± if the
licensing requirement has satisfied after check and validation of
the rectification report. If the manufacturer fails to complete the
required rectification within 6 months or fails to meet the
licensing requirements after rectification, the survey conclusion
shall be changed to ¡° disaccord with the licensing
requirements¡±.
Article 18. The Survey and Assessment Agency shall
complete a survey and assessment report in writing based on the
survey report of survey team and report Safety Supervision
Department of License-issue Authorities.
Chapter 5 Approval, Issuance and Renewal of
Manufacture License
Article 19. The Safety Supervision Department of
License-issue Authorities shall review and approve the
survey-and-assessment report and endorse a comment for the
conclusion of verified.
Article 20. The Safety Supervision Department shall
report the License-issue Authorities to approve and issue
Manufacture License to the manufacturer whose verified conclusion is
¡°accord with the requirements¡±. The Safety Supervision Department
shall notice of the conclusion of ¡°not granting manufacture license¡±
to the manufacturer, whose survey conclusion is ¡°disaccord with the
licensing requirements¡±, after having reported to license-issue
Authorities.
Article 21. The Manufacture License is valid within
four years beginning from the date of issuance. The license holder
should apply for license renewal in writing to the Safety
Supervision Department directly under AQSIQ or Provincial Quality
and Technical Supervision Bureau six months ahead of the expiry of
its Manufacture License, if the license holder wants to maintain
continuously a valid Manufacture License after expiration.
Article 22. The Manufacture License will
automatically become invalid when beyond the expiration of term of
its validity if the license holder has not made any renewal
application and the original license holder will be regarded as
giving up the license automatically.
Article 23. The procedure of application,
acceptance, survey and assessment, approval and issuance of license
renewal accords with the regulations from Chapter 2 to Chapter
5.
Article 24 The product required to conduct type
testing can be exempted from the type testing if there are no
changes on applicable standards, material, structure and operational
conditions of the product during license renewal.
Article 25 The Safety Supervision Department shall
notice of the conclusion of ¡°not granting the manufacture license¡±
to the manufacturer, whose verified conclusion is ¡° disaccord with
the requirements¡±, after having reported to license-issue
Authorities. The manufacturer, which has failed to pass the
licensing renewal, is allowed to make any other application for a
lower level manufacture license.
Chapter 6 Cancellation, Suspension and
Withdrawal of Manufacture License
Article 26 If the manufacturer will no longer
produce boiler and pressure vessel because of bankruptcy or changing
production, it should return the manufacture license to the
License-issue Authorities and go through the formalities of
cancellation.
Article 27 If the License-issue Authorities is going
to order the license holder to make corrections in accordance with
the Administration Regulation, it should inform the manufacturer in
writing and specify the non-conformities to be corrected and the
deadline of correction.
Article 28 If the License-issue Authorities is going
to suspend the license in accordance with the Administration
Regulation it should inform the manufacturer in writing, specifying
the reason of suspension, the time limit for suspension and the
requirements for its correction.
Article 29 If the License-issue Authorities is going
to withdraw the license, it should inform the manufacturer in
writing, specifying the reason for withdrawal. The manufacturer
should return the Manufacture License to the License-issue
Authorities.
Chapter 7 Supplementary
Articles
Article 30 The AQSIQ is responsible for the
interpretation of these procedures.
Article 31 These Procedures shall be effective as of
January 1, 2004.
|